Publications: AARD
Publications by Research Area
Publications by Division
Reset Search
2015
Eto, Joseph H, Emma M Stewart, Travis Smith, Mark Buckner, Harold Kirkham, Francis Tuffner, and David Schoenwald."Scoping Study on Research and Priorities for Distribution-System Phasor Measurement Units."
(2015). DOI
Eto, Joseph H, De Tran, John Baranowski, Kevin Frankeny, Bharat Bhargava, and Song Xue."Using Synchrophasor System Data for Establishing Operating Range for Operators Guidance and Detection Analysis of Significant Events."CIGRE 2015 Grid of the Future Symposium
(2015).
Martinez, Carlos A, and Joseph H Eto."Wide-area monitoring of the North American power grid: An integrated portfolio of real-time reliability tools."2015 IEEE Power & Energy Society General Meeting
(2015) 1 - 5. DOI
2014
Overholt, Philip, Dmitry Kosterev, Joseph H Eto, Steve Yang, and Bernard Lesieutre."Improving Reliability Through Better Models: Using Synchrophasor Data to Validate Power Plant Models."IEEE Power and Energy Magazine
12.3 (2014) 44 - 51. DOI
2009
Budhraja, Vikram S, Fred Mobasheri, John Ballance, Jim Dyer, Alison Silverstein, and Joseph H Eto."Improving Electricity Resource-Planning Processes by Considering the Strategic Benefits of Transmission."The Electricity Journal
22.2 (2009). DOI
2008
Eto, Joseph H, Manu Parashar, Bernard Lesieutre, and Nancy J Lewis."California ISO Phasor Application Summary Report (Real-Time Grid Reliability Management PIER Final Project Report Appendix D)."Public Interest Energy Research (PIER) Program
(2008) 30.
Eto, Joseph H, Manu Parashar, Bernard Lesieutre, and Nancy J Lewis."Prototype Phasor-Based Real-Time Monitoring Software Tool - Training Presentation (Real-Time Grid Reliability Management PIER Final Project Report Appendix E)."Public Interest Energy Research (PIER) Program
(2008) 61.
Eto, Joseph H, Manu Parashar, Bernard Lesieutre, and Nancy J Lewis."Prototype Phasor-Based Real-Time Monitoring Software Tool - User Guide (Real-Time Grid Reliability Management PIER Final Project Report Appendix F)."Public Interest Energy Research (PIER) Program
(2008) 78.
Eto, Joseph H, Manu Parashar, Bernard Lesieutre, and Nancy J Lewis."Scoping Study Report on Improving Load and Generator Response Models (Real-Time Grid Reliability Management PIER Final Project Report Appendix G)."Public Interest Energy Research (PIER) Program
(2008) 82.
Martinez, Carlos A."Intelligent real-time tools and visualizations for wide-area electrical grid reliability management."IEEE Power and Energy Society General Meeting - Conversion and Delivery of Electrical Energy in the 21st Century
(2008) 1 - 4. DOI
Parashar, Manu, Abhijeet Agarwal, Yuri V Makarov, and Ian Dobson."Real-Time Voltage Security Assessment (RTVSA) Report on Algorithms & Framework."
(2008) 73.
Parashar, Manu, Abhijeet Agarwal, Yuri V Makarov, and Ian Dobson."Real-Time Voltage Security Assessment (RTVSA) Summary Report."
(2008) 49.
Force, NERC Real-Time Tools Best Practices Task, and Joseph H Eto."Real-Time Tools Survey Analysis and Recommendations, Final Report."
(2008).
Parashar, Manu, and Abhijeet Agarwal."Real-Time Voltage Security Assessment (RTVSA) Algorithms Simulation & Validation Results."
(2008) 21.
2007
Parashar, Manu, Abhijeet Agarwal, Yuri V Makarov, and Ian Dobson."Real-Time Voltage Security Assessment (RTVSA) Tool Functional Specifications For Commercial Grade Application."
(2007) 30.
Martinez, Carlos A, Robert W Cummings, Philip Overholt, and Joseph H Eto."Reliability Monitoring: The High-Tech Eye in the Sky."Public Utilities Fortnightly
(2007).
2006
Group, Electric Power."DOE Wide-Area Situational Awareness for Load-Generation Adequacy Using NERC Resources Adequacy Monitoring."
(2006).
2004
Kezunovic, Mladen, Goran Latisko, and Nitin Ved."Real-Time Monitoring and Assessment of Circuit Breaker Operations for Diagnostics and Control Applications."
(2004) 14.
2003
Martinez, Carlos A, Jim Dyer, and Mark Skowronski."Supplier and Control Area Performance Monitoring System: Utilization of Grid-3P for Automatic Generation Control (AGC), Frequency Response Reserves (FRR) and Ancillary Services (AS) Regulation."Consultant Report prepared for the California Energy Commission
(2003) 20.
2002
Group, Electric Power."CERTS Area Control Error (ACE) - Frequency Real-Time Monitoring System."
(2002) 14.